Early access: courses are being reviewed by field engineers
Service EngineerAcademy
Academy / Field fault notes / Dirui ДС 240 (DDC 240)
Dirui · ДС 240 (DDC 240)

Dirui DS 240 (DDC 240): dirty reaction cuvettes after runs

What happened

Reaction cuvettes kept coming out dirty after analyzer runs. Reported in the case: new cuvettes and a new lamp had already been fitted, and the problem remained.

What was checked

Cause

Not confirmed in this case. The engineers considered the likely causes to be dust on the optics, a misaligned lamp, or a wash-station fault delivering too much or too little fluid, so the cuvettes were not being rinsed clean.

The cause is probable and was not fully confirmed.

What was done

For this case, the suggested fix was to verify the lamp alignment as a procedure from the manufacturer's service documentation, done by authorised personnel, and to check the wash station cycle by cycle: correct fill and drain of each cuvette, no overflow or underfill, and free-flowing wash lines without partial blockage.

Safety

Used cuvettes and wash and waste fluids are potentially infectious — wear gloves and eye protection, and isolate the analyzer from the mains before reaching into the wash station or optical module.

Lesson: When new cuvettes and a new lamp do not clear dirty reaction cuvettes, check the wash-station fluid delivery and optical alignment before replacing any more parts.

Covered in the course: Lab Analyser Service — Level 2: Fault-Finding →

Written from an anonymised case shared by service engineers. It is not a manufacturer instruction and grants no authorisation. Independent note; names are trademarks of their owners.

← All notes