What happened

The anesthesia machine powered up initially from its internal batteries even though mains power was connected. Reported in the case: main battery pack around 21 V, battery on the central board around 3 V.

What was checked

Cause

The engineers found that the main battery pack was aged and no longer held charge properly; the machine had clearly gone a long time without service (heavy dust build-up). This is one case, not a general rule.

The cause is probable and was not fully confirmed.

What was done

Replacement of the main battery packs. The outcome was reported as probable: the engineers recommended confirming that the machine now starts from mains and that the new batteries charge and hold load. The low reading of the central board battery was noted in the case, but no further action on it was described.

Safety

Switch the machine off and isolate it from mains before opening it; battery terminals can deliver a large short-circuit current, and after any work on a patient-connected machine complete the electrical safety and system self-tests before return to use.

Lesson: Check battery condition on a schedule — a mains-powered machine that boots on batteries almost always has tired batteries or a supply fault, and it will let you down at the worst moment.