Hitachi Scenaria: very slow image transfer to PACS

What happened

A CT study of about a thousand images (as reported) went to PACS in batches of three images at a time, so the transfer dragged on; from another workstation the same PACS received data in seconds. The network was believed to be gigabit and the DICOM settings (AeTitle, ports) were correct.

What was checked

Cause

The bottleneck was the physical network link: the wall outlet/port in the scanner room negotiated only 100 Mbit instead of gigabit, so every DICOM association crawled. All settings above the cable were correct — the engineers found the fault at the physical layer.

The cause is probable and was not fully confirmed.

What was done

The link was brought back to gigabit by reworking the defective wall outlet/patch connection, after which the slow send disappeared; no DICOM setting on the scanner was changed. The outcome was reported as probable, so verify the transfer speed after the repair.

Safety

Tracing cabling behind a CT means working near mains-powered equipment: handle only the low-voltage data leads and patch ports, keep clear of power outlets and scanner connections, and if any step requires entering or opening the scanner, leave it to authorised personnel and perform the electrical safety test before return to use.

Lesson: When one device sends to PACS slowly while another reaches the same PACS quickly, check the negotiated link speed at the wall port and switch before touching any DICOM settings.

Covered in the course: CT Service — Level 2: Fault-Finding →

Written from an anonymised case shared by service engineers. It is not a manufacturer instruction and grants no authorisation. Independent note; names are trademarks of their owners.