What happened
As reported in the case, several chillers built for MRI trailers failed in a short service time, and the failures were tied to the electronic expansion valves (EXVs). No fault codes were logged; the engineers found the pattern across multiple units rather than a single machine.
What was checked
- No diagnostics were recorded in the case — the failures were grouped by time and by the same component, not by symptoms or fault codes.
- For similar repeat EXV failures, the sensible route is to log superheat behaviour and valve drive response and check the refrigerant charge condition (moisture, acidity) before condemning hardware; none of this was documented here.
Cause
Not established. The case contains no diagnostics, so the root cause of the early EXV failures was never determined — only the repeated early-failure pattern across several units is known.
What was done
The engineers replaced the affected chillers with conventional chillers and air-conditioning units. The swap was complicated by the large refrigerant charge that had to be recovered from the circuits. As reported, the problem did not return after the replacement.
Safety
A large refrigerant charge is stored pressure and an asphyxiation and frostbite hazard — recover it with a recovery machine into rated cylinders, never vent it to atmosphere, and confirm the circuit is fully empty and de-pressurised before opening or brazing any line.
Lesson: When the same component fails early on several units of one fleet, treat it as a batch or design problem and plan a fleet-level fix — including refrigerant recovery logistics — instead of swapping valves one by one.