Philips Ingenia: periodic preventive maintenance schedule (no fault)

What happened

An engineer asked for the periodic preventive maintenance routine for a Philips Ingenia MRI. There was no breakdown - the request was purely about planning the service work.

What was checked

Cause

Not a fault. The case reflects a common gap: no written interval-based maintenance plan kept at hand, so the engineer had to ask colleagues for a working routine.

What was done

In this single case the engineers compiled a working schedule at the intervals reported above and used it as a site checklist. The outcome was described as solved. Calibration and adjustment steps were treated as procedures from the manufacturer's service documentation, done by authorised personnel; the checklist supplements, but does not replace, the official manual for the specific configuration.

Safety

The magnet is always on: keep MR-zone access discipline and cryogen/quench precautions, and complete the manufacturer's electrical safety checks (earth bonding and leakage currents) before returning the scanner to clinical use.

Lesson: A simple interval-based preventive maintenance checklist, kept on site and filled in honestly, prevents more downtime than any late fault call.