Siemens Symphony: one phase missing at transformer input

What happened

The engineers found only two of three phases at the input transformer; on the output the reported voltages were 230/230/100 V — one winding clearly without real power.

What was checked

Cause

One phase was absent from the incoming three-phase supply — in the engineers' view, most likely lost before the scanner, on the utility side. The 100 V measured where the third phase should have been was induced voltage transferred through inter-phase coupling in the transformer, not a real supply.

What was done

The incident was resolved once the missing phase was back on the incoming supply, apparently restored on the utility side; the case notes do not describe any repair inside the scanner itself.

Safety

A transformer input is live three-phase distribution: measure with a rated meter and sound probes, never take a low or induced reading as proof of a dead conductor, and verify a safe state before touching anything.

Lesson: A low voltage on a 'lost' phase is usually induced rather than real — trace a missing phase all the way to the building's incoming supply before blaming the machine.

Covered in the course: MRI Service — Level 2: Fault-Finding →

Written from an anonymised case shared by service engineers. It is not a manufacturer instruction and grants no authorisation. Independent note; names are trademarks of their owners.