Siemens Trio OR64: Helium level falls short of the control mark after cool-down
What happened
The magnet's helium level had dropped to the point where a cool-down was required. After the transfer, the level still came up short of the control mark — the reported eight dewars were almost not enough.
What was checked
- Helium transfer carried out dewar by dewar, level checked after the full reported volume of eight dewars, per the manufacturer's service documentation.
- Level re-checked after roughly a week of downtime (as reported in the case) and replacement of the cold-head displacer.
Cause
No confirmed root cause was given in the case. The engineers' assumption: a worn cold-head displacer was not delivering its rated cooling capacity, and the level also needed settling time to stabilise; normal behaviour returned only after both.
What was done
The system was left standing for about a week and the cold-head displacer was replaced — a procedure from the manufacturer's service documentation, done by authorised personnel. At the re-check the level showed up by the middle of the second dewar (as reported), the eight dewars proved sufficient, and the cool-down was completed successfully.
Safety
Cryogenic helium transfers displace oxygen and cause cold burns: before starting, verify room ventilation and the oxygen depletion alarm, wear cryogenic PPE, and remember the magnet stays at full field throughout the work.
Lesson: When a cool-down stalls just short of the control mark, check the cold head's condition and give the system settling time before blaming the transfer or ordering more helium.
Covered in the course: MRI Service — Level 2: Fault-Finding →
Written from an anonymised case shared by service engineers. It is not a manufacturer instruction and grants no authorisation. Independent note; names are trademarks of their owners.