The Level 2 method for power and cooling: logs, recordings, trends and owners

Collect and align the records of the scanner, the UPS, the chiller, a power analyser and the room loggers on one timeline, separate the first cause from its consequences, and hand the proven fault to the owner of the failed link with evidence that settles the question.

Where Level 1 stops and Level 2 starts

Level 1 gave you the map: the power path from the intake to the scanner, the heat path from the gantry or the cold head compressor to the outdoor condenser, and a habit of looking outside the scanner before opening it. That habit finds the weak link in many calls. The calls that come to Level 2 are the ones where the habit is not enough: the trip happens twice a week and never while you watch, two links fail together, or three parties each insist that their part is fine.

Level 2 work has three steps. First, prove which link failed, with records rather than opinions. Second, follow the fault inside that link to the block or the part, as far as your training and authorisation allow. Third, hand what remains to the owner of that link in a form that leaves nothing to argue about. This lesson is about the first and the third step; the rest of the course is about the second, link by link.

Five sources of evidence and their blind spots

The scanner's error log is the record you know best, and it is the least reliable about the site. It reports what the scanner felt: a power fail message, a water temperature warning, a compressor stop, an inverter fault in its own generator. It rarely knows why. On many systems the first site-related entry is followed by a cascade of secondary errors as subsystems lose power or overheat one after another; the loudest message at the end of the cascade is often the least useful.

The UPS event log records changes of mode: to battery, to static bypass, back to inverter, overloads, input voltage or frequency out of tolerance, battery test results, fan and temperature alarms. Its weaknesses are a limited buffer that overwrites the oldest events, a clock that nobody set, and a difference between what the front panel stores and what a network card or monitoring software stores. Some warnings light an indicator without writing anything to the log at all. Save the log in every form the UPS offers before anyone resets an alarm.

The chiller controller keeps an alarm history: high and low pressure, flow, antifreeze or low water temperature, compressor overload, fan faults, sensor faults. Some controllers keep only active alarms and lose the history when power is removed; others separate real trips from pre-alarms that only warn. Learn which kind is on your site, and photograph the alarm screen before the facility resets it.

A power quality analyser gives what no device log gives: the voltage and current waveforms at the scanner input, with dips, swells, transients, harmonics and imbalance stamped with their time. It sees only what happens where it is connected and while it records, so placement and duration decide its value. Room and water loggers give temperature and humidity trends, often the only witness to what happened at night.

Add a sixth source that is not a device: people. The radiographer who filmed a blinking UPS indicator on a phone, the guard who heard the chiller stop, the facility electrician who switched a feeder last Tuesday. Ask early, write it down with the time, and treat it as a lead to confirm with a record.

One timeline from many clocks

Records only become evidence when they share a time base. Choose one reference clock, such as a mobile network time or the hospital's time server, and note the offset of every device against it on the day you collect the logs: scanner, UPS, chiller, analyser, loggers. Offsets of minutes are common; after a long outage a device without a working backup battery may be years off. Write the offsets on the timeline itself, so that the next reader does not have to repeat your work.

Then build a table: time, source, event, value. Put the events of all devices in one column of time. Mark the resolution of each source, because a UPS that records to the second and a chiller that records to the minute cannot prove which came first when they are thirty seconds apart. When the order matters and the resolution is too coarse, the analyser or a dedicated logger becomes the referee.

Read the table with three rules. A cause comes before its effect, after allowing for the clock uncertainty. A real cause repeats: one coincidence proves little, three events with the same order begin to prove something. And a cause usually has a dose: the trip is more frequent on hot afternoons, during heavy sequences or when a large motor starts. When all three point the same way, you have a hypothesis worth a test; when they disagree, keep recording.

Trends beat snapshots

A single reading taken when the fault is absent tells you only that the fault is absent. Infrastructure faults usually develop over days or seasons, and trends show them long before a trip. The useful trends are few: supply and return temperatures and delta T on each loop, loop pressures, chiller condensing pressure against outdoor temperature, compressor running time, UPS load and its peaks, battery block voltages and internal resistance, room temperature and humidity.

Compare like with like. A condensing pressure means nothing without the outdoor temperature at the same moment; a UPS load means nothing without knowing whether the scanner was idle or running its heaviest protocol. Note the conditions with every reading, and compare with readings taken under similar conditions.

Learn the shape of the change. A step change, where a reading moves at once and then stays, points at an event: a valve turned, a setting changed, a pump replaced, a phase reconnected. Look for what happened on that day. A slow drift points at wear or fouling: a strainer filling, a condenser coil clogging, a pump impeller wearing, a battery string ageing. A drift that speeds up is a failure approaching, and the time to act is before it arrives.

The interfaces between building and scanner

Between the infrastructure and the scanner there are signals as well as power and water. A chiller sends a general alarm through a dry contact to a panel or to the scanner; a UPS sends status signals, and some imaging systems start a controlled shutdown when the UPS reports battery low; an emergency-off loop runs through several cabinets; flow and temperature interlocks stop a compressor or an amplifier. Each of these paths has relays, terminals, cables and sometimes a small power supply of its own.

When the two sides disagree, suspect the path between them. A chiller that runs normally while the scanner reports its alarm, or a scanner that shuts down for battery low while the UPS shows full batteries, often has a fault in the interface: a stuck or burnt relay, a loose terminal, a contact that was rewired during another job. Read the interface drawings in the installation documents, check the signal at each end with the systems in a safe state, and repair it within the scope agreed with its owner. Never bridge an interface signal to silence an alarm; a silenced alarm will not warn anyone when the real fault comes.

Owners, authorisation and the evidence pack

Level 1 asked you to know who owns each link. At Level 2 you also need to know what you may do on each one. As a rule, a scanner service engineer may read displays and logs, measure from safe test points with the right instruments, inspect, clean filters and coils where the owner allows it, and reset alarms by the documented procedure. Opening a refrigerant circuit, switching building switchgear, operating a UPS maintenance bypass or changing protection settings of a UPS or a chiller belong to people trained and authorised for that equipment. Entering a service menu with a password you were given informally is not authorisation.

When the evidence points outside your scope, write the evidence pack. Keep it short and factual: the symptom and its pattern, the timeline with offsets, the readings with their conditions, what you have ruled out and how, the link you believe failed and the reason, and the question you need the owner to answer. Attach photos, log files and analyser extracts. Send it in writing to the owner and copy the people who decide on the scanner's use.

A good pack turns a dispute into a job. The chiller contractor who receives 'primary supply temperature rose above the site limit eleven minutes before each compressor trip, three times this week, condensing pressure high for the outdoor temperature' does not argue; he brings coil cleaner.

  • Save every log before any reset, in every format the device offers.
  • Note clock offsets against one reference on the day of collection.
  • Record conditions with every reading: load, protocol, outdoor and room temperature.
  • Look for steps and drifts in trends, not only for limits crossed.
  • Check interface signals at both ends before blaming either system.
  • Stay inside your authorisation; send the rest as a written evidence pack.
Fault-finding flowA scanner fault that may come from the site
The scanner trips, aborts oroverheats, and a site cause issuspected.Are all logs savedbefore any alarm wasreset?1NoSave scanner, UPS and chiller logsnow; photograph the panels.YesAre clock offsetsnoted against onereference?2NoMeasure each device offset and writeit on the timeline.YesDoes a site event comebefore the firstscanner error?3NoNo site event first: treat it as ascanner fault, keep recording.YesDoes the same orderrepeat on more thanone event?4NoOne coincidence proves little:record with analyser and loggers.YesIs the interfacesignal between the twosystems sound?5NoTest relay, terminals and cable perthe interface drawings.YesHas the owner receivedthe evidence pack inwriting?6NoSend timeline, readings and thequestion; copy the users.YesThe failed link is proven:fault-find it with its ownerat your authorised level.
Trainer: walk the fault-finding flowAnswer each check as if you were at the machine. The flow leads you to the cause.
field case

A light on the UPS that the log never saw

Radiographers on an MRI site kept seeing an indicator light up on the UPS front panel and filmed it on a phone, because by the time an engineer arrived it was off and the UPS event log showed nothing for those moments. The scanner itself reported no fault. Colleagues who knew that UPS family recognised the indicator from the video: a warning from the bypass line that its input parameters had moved outside the limits set in the UPS. In their reading it was not an error and did not affect online operation, because the load was running on the inverter. The likely trigger was the short current peaks drawn when the gradients started a heavy sequence or the chiller compressor started on the same supply. The fix offered was to leave it, or to review the bypass tolerance settings with the UPS service.

A video with a time on it is evidence. Identify what the indicator means before treating it as a fault, and look for the load event that coincides with it.

From service practice

The chiller was fixed, the alarm stayed on

An Aermec chiller serving an MRI tripped on high pressure. The cause was dealt with, the chiller restarted and ran normally, yet the chiller alarm lamp on the MRI's climate control panel stayed lit, and the site assumed the chiller was still faulty. The engineers first reset the chiller and confirmed how the panel's general alarm is cleared. The lamp still did not go out. The fault was in neither machine: a relay between the chiller's alarm contacts and the lamp in the panel had failed. Replacing it cleared the alarm. Colleagues added that on those chillers active alarms are cleared from the controller, while pre-alarms stay in the alarm history as a record.

When one side is healthy and the other still reports a fault, test the signal path between them before working on either machine.

From service practice

A beeping UPS at a remote site

At a remote site with an imaging workstation, a UPS kept beeping. Because the site was far away, the first theory was discussed by phone: a flat BIOS battery in the radiographer's workstation, which can produce strange start-up behaviour. Checking the UPS itself settled it. Its battery had reached the end of its life, and the beeping was the UPS warning about it. A new battery stopped the alarm. The detour cost time only because the device that was making the noise was not checked first.

Start with the device that raises the alarm and its own log or test. A plausible theory about a neighbour is not evidence.

On-site checklist

  • Collect scanner, UPS, chiller and logger records before resets.
  • Write a single timeline with sources, resolution and clock offsets.
  • Ask staff what they saw and heard, with times.
  • Trend delta T, pressures, UPS load, battery data and room climate.
  • Check interface relays and contacts at both ends.
  • Send a written evidence pack to the owner of the failed link.

Check yourself

1. An MRI shows a gradient fault at 03:14 by its clock; the UPS shows a transfer to battery at 03:09 by its clock. Before you conclude anything, what do you need?
2. A chiller's condensing pressure was higher this week than last week. What do you need before calling it a trend?
3. Loop delta T across the scanner's heat exchanger jumped on one day and stayed at the new value. What does the shape suggest?
4. The chiller runs without alarms, but the MRI's climate panel keeps showing a chiller alarm. Where do you look first?
5. Your evidence points at the hospital-owned chiller. What is the right next step?