Checks: supplies, O2 failure and ratio protection, leaks, the ventilator on a test lung and the calibrations
Run a complete engineer's checkout of an Aeon 7200A with your own instruments, judge each result against the manufacturer's values, and know which calibration to run when, and in what state the machine must be first.