Planned maintenance by the manufacturer's kit
Plan and carry out an anaesthesia workstation PM: identify the kit and intervals for the model, replace seals, vaporiser port o-rings, flow sensors, the O2 cell and batteries, inspect the absorber, valves, bellows or piston, and leave the machine ready for checkout and verification.
