Early access · courses are being reviewed by field engineers
Service EngineerAcademy
03Lesson 3 / 5 · 24 min

Preventive maintenance and the site: cooling, cryocooler, shield, coils, cabinets and image quality

Plan and carry out a SIGNA preventive maintenance visit that covers the cooling loops, the cryocooler, the helium trend, the RF shield, coils and cables, cabinets and UPS, and close it with image quality checks and records that prove the system is as good as at its last baseline.

This lesson is part of the paid course

Enrol to open all lessons, the exam and the certificate.