Early access: courses are being reviewed by field engineers
Service EngineerAcademy
Academy / Courses / Planned Maintenance Programme for Medical Equipment
GeneralCertificate course

Planned Maintenance Programme for Medical Equipment

Inventory, risk classification, procedures, scheduling, records and audit for heads of department and service managers

Start the free lesson
$79 per engineer · the first lesson is free
For teams: 5 seats for $290 (the price of 4) · Get a quote · How team training works

As head of a biomedical engineering department or a service company manager, you answer for every device in the hospital: is it on the list, how often is it checked, who does the work, and can you prove it was done. This course shows how to build that programme step by step from open WHO guidance and the US CMS memo on alternate equipment management: a clean inventory, risk-based classification, manufacturer-based procedures, a schedule that fits your engineer-hours, records that satisfy an auditor, and a quarterly report management can act on.

Not started
01

A green PM spreadsheet proves only that dates were typed in.

  • The PM plan is a list of due dates, but nobody can say which devices are actually on the wards, which are missing, or why each type is maintained the way it is.
  • The schedule assumes more engineer-hours than the team has, so completion falls wherever it falls and life-support equipment slips with everything else.
  • Contractor reports, missing values and 'could not locate' lists make an audit stressful, and there are no figures to defend the budget or a request for staff.
02

After the course you can

01Explain what a planned maintenance programme consists of, who owns each part and where your current arrangement is weakest.
02Define inventory fields, run an inventory clean-up, assign unique IDs and control the entry and exit of equipment through acceptance testing and retirement.
03Score equipment types with the WHO sample risk method, keep high-risk equipment on the manufacturer's maintenance, and judge when an alternative strategy could be justified under a documented process such as the CMS AEM programme.
04Build PM procedure sheets from manufacturer documentation, including performance verification and electrical safety, and decide in-house or contractor per equipment type.
05Build an annual schedule, estimate the staffing in engineer-hours, measure completion by priority group and handle overdue and 'could not locate' devices by rule.
06Keep audit-ready records, use completion, location rate and failure-found rate to improve the programme, and present it to hospital management.
03

Curriculum

01What a planned maintenance programme is and why it matters
Explain to your team and to hospital management what a planned maintenance programme consists of, what it is for, who owns each part, and where your current arrangement is weakest.
free
20 min
02The equipment inventory: what to record, how to build it and keep it true
Define the data fields for your equipment inventory, run an initial inventory or clean-up of an existing one, assign unique IDs, bring new equipment in through acceptance testing and take old equipment out through a documented retirement.
22 min
03Risk-based classification: what goes into the programme, and when an alternative strategy is allowed
Score equipment types for inclusion and priority with the WHO sample method, decide which types stay on the manufacturer's recommended maintenance, and judge whether an alternative strategy could be justified under a documented process such as the CMS Alternate Equipment Management programme.
25 min
04Procedures and intervals: what is done at each PM, by whom and with what
Build PM procedures from manufacturer documentation, include performance verification and electrical safety, decide whether a type is maintained in-house or by a contractor, control the calibration of your test equipment, and write a PM procedure sheet an auditor and a new engineer can both follow.
22 min
05Scheduling, workload and completion: making the plan happen
Build an annual PM schedule, estimate the engineer-hours it needs, measure completion by priority group, handle overdue and 'could not locate' devices by a written rule, and oversee contractor work as part of your own plan.
25 min
06Records, indicators and audit: proving the programme works and improving it
Keep records that satisfy an auditor, calculate and interpret the main programme indicators, show how PM affects failures and downtime, run an annual programme review, and present the programme to hospital management in terms they act on.
24 min
—Exam
25 · 40 min · 75 %
04

The certificate

Pass the exam and get a certificate of course completion with your name, hours and score. Every certificate has a unique number and a public verification page, so an employer or a customer can check it in one click. It confirms completion of the course; it is not an educational document (diploma) and not a manufacturer authorisation.

Certificate of course completion
Alex Example
has completed the course
Planned Maintenance Programme for Medical Equipment
3 hours · score 86 %No. SEA-US1-000000-K7QF3M · verify at /verify/
The 3 training hours may be self-reported as continuing education (Category IV) toward renewal of AAMI CBET/CRES/CLES certification.
05

Who it is for

Who it is for

  • Heads of biomedical and clinical engineering departments
  • Service company managers responsible for hospital maintenance contracts
  • Senior engineers preparing to take over planning, audits or a department
  • Hospital quality and safety staff who review equipment maintenance

Who teaches

Written by a service engineer working with medical equipment since 2014, including 6.5 years at GE Healthcare and service supervision at Mindray, together with the engineers of Service Engineer.

06

FAQ

Is this course affiliated with WHO, CMS, The Joint Commission or ISO?

No. It is an independent course. It explains and applies open WHO guidance (WHO Medical device technical series, 2011) and the public CMS memorandum S&C 14-07-Hospital (20 December 2013). It is not approved or endorsed by WHO, CMS, The Joint Commission, ISO or any other body.

Does it replace national regulation or manufacturer documentation?

No. National rules, your accreditation standard and the manufacturer's service documentation always take precedence. The course shows how to build a programme around them and where to check them. The CMS memo applies only to US hospitals; it is used as a clear example of what a regulator expects.

Will it tell me which intervals to use for each device?

No. Intervals come from the manufacturer's recommendations, adjusted only through a documented, evidence-based process where your rules allow it. The course teaches that process and the WHO sample scoring method; it does not publish intervals.

Do I need a CMMS?

No. The methods work on paper or a spreadsheet for a small hospital; a CMMS makes larger programmes easier to run and report.

Does it cover paid standards such as AAMI EQ56 or ISO 13485?

They are named as further reading only. The course does not reproduce or summarise their content.

What does the certificate say?

Your name, the course, the hours, the date and your exam score, with a unique number and a public verification page.

Languages?

English and Russian.