Procedures and intervals: what is done at each PM, by whom and with what
Build PM procedures from manufacturer documentation, include performance verification and electrical safety, decide whether a type is maintained in-house or by a contractor, control the calibration of your test equipment, and write a PM procedure sheet an auditor and a new engineer can both follow.