Early access · courses are being reviewed by field engineers
Service EngineerAcademy
03Lesson 3 / 5 · 24 min

Preventive maintenance: adsorber, helium charge, couplings, cooling and the cold head interval

Plan and carry out the periodic maintenance of a CSA-71A or CSW-71D at procedure level: adsorber replacement, helium top-up with a purged charging line, coupling and flex line care, air or water side care, and plan cold head service before it fails.

This lesson is part of the paid course

Enrol to open all lessons, the exam and the certificate.